Inauguration of the new platform of the Bergamo railway station

On the occasion of the inauguration of the new platform of the Bergamo railway station on 02/05/2024, we set up a sized tent structure. 5×80 m. with crystal sheets, which hosted a photographic exhibition and the meeting to present the works.

Below is what was published by the newspaper L’eco di Bergamo:

Salvini in Bergamo for the doubling construction site: «The works at the station, an important step. Inconveniences to be contained»

VISIT. The Minister of Infrastructure in the city: «Infrastructure is the backbone of the country and Lombardy, like a locomotive, needs more trains». Gori: «These interventions only partially cover the delays that have accumulated over the years».

This «is another important step. Throughout Lombardy and throughout Italy we are making up for lost years» declared the deputy prime minister and minister of Infrastructure and Transport, Matteo Salvini, this morning (5 February) regarding the start of work on the new Bergamo-Airport station Orio al Serio and doubling of the Ponte San Pietro-Bergamo railway line. «Infrastructure is the backbone of the country and Lombardy, like a locomotive, needs more trains. I am very happy», added Salvini referring to the doubling construction site.

Recommend
  • Facebook
  • Twitter
  • LinkedIN
  • Pinterest
Share
Tagged in